OEM and CIF Office Furniture Sourcing Guide
A practical checklist for international buyers sourcing office furniture from China.
- Share drawings, quantities, destination port and target schedule.
- Confirm samples, inspection criteria, packaging and documentation.
- Compare FOB and CIF terms so freight and insurance responsibilities are clear.
OEM process and approval gates
Start with drawings, bill of materials, finish references and a signed sample. Confirm the pilot build before mass production, and keep a written change log for every revision.
Delivery, CIF and shipping responsibilities
Set the production lead time, loading window and destination port in the purchase order. Under CIF, confirm which freight, insurance and destination charges are included and which remain with the buyer; compare the same scope against an FOB quotation.
Inspection, documents and certification
Agree the inspection method, sampling level, packaging checks and defect-resolution process before production. Request the commercial invoice, packing list, bill of lading and available test or certification documents that apply to the destination market. Do not assume a certification is included until the issuing scope and validity are verified.